Pinnacle Tower - Exterior Wall Remediation & Cladding

Hycgan is focused on delivering innovative solutions to enhance the safety and energy efficiency of existing structures. We successfully used our mast climber platform to deliver retrofitting of The Pinnacle Tower in London, in a fraction of the time and cost for traditional scaffolding work.

The Project

The Pinnacle Tower is located in the heart of North West London, with views over Wembley Stadium and across the London skyline.

With 131 new homes, including studio flats, one and two-bedroom apartments and two and three-bedroom duplex penthouses, The Pinnacle Tower provides residents with the very best value for their investment.

Hycgan worked on the Pinnacle Tower to retrofit the build’s cladding, stripping it of Aluminium Composite Material cladding panels.

With a circular structure, Hycgan implemented its innovative method of exterior wall remediation to provide a customised approach to a difficult building structure.

Project Objectives

  • Control: Ensuring control over all aspects of the construction value chain.
  • Safety Enhancement: Replace outdated cladding with modern, fire-resistant materials to improve building safety.
  • Energy Efficiency: Install cladding systems that provide better insulation, reducing the building’s energy consumption.
  • Aesthetic Upgrade: Modernize the building’s exterior to improve its visual appeal and align with contemporary architectural standards.
  • Durability: Ensure the new cladding offers long-term durability and minimal maintenance.

Contact Us

For more information about this project or to discuss your building retrofit needs, please get in touch with us.

Email: hello@hycgan.com